The formwork is mounted
The formwork is mounted on the originally prepared basis. Several layers of large stones are laid before the main work (15 cm in average size), crushed stone is covered in the cracks between them.
The formwork is mounted on the originally prepared basis. Several layers of large stones are laid before the main work (15 cm in average size), crushed stone is covered in the cracks between them.