With ¼ of
The stones are filled with a concrete mixture (it is seized with ¼ of concrete material and ¾ from sand). These layers need to be created 2 or 3, it all depends on the size of the upcoming barbecue and, of course, the dug pit.
The stones are filled with a concrete mixture (it is seized with ¼ of concrete material and ¾ from sand). These layers need to be created 2 or 3, it all depends on the size of the upcoming barbecue and, of course, the dug pit.